Trade with Greece - 2011 - page 105

lowest bidder or when the studies are below the
limits set by EU directives). The study contracts
shall be awarded either to the lowest bidder (in
the case of contracts of less than €300,000,
which comprise one or two main studies) or to the
most advantageous bid (in the case of all other
contracts). The service contracts shall be award-
ed to the lowest bidder; however, the most advan-
tageous bid may also be taken into consideration.
The weights attached to the sub-criteria compris-
ing the final grade have been calculated in a man-
ner that does not, according to the Ministry, ben-
efit bidders that offer large discounts, albeit pro-
vide flawed technical solutions.
Small-scale contracts
The draft law also aims at ensuring that small-
scale contracts are awarded on the basis of
objective criteria, since study contracts with pre-
estimated fees of up to €30,000, and service con-
tracts with pre-estimated fees of €15,000 shall
continue to be directly awarded; nonetheless, the
relevant procedure is amended.
Production of projects
The Studies and Projects Supervisory Authority is
responsible for checking the phase that precedes
the awarding of public works contracts, studies,
or other similar (technical) services of community
interest. The contracts will be subject to supervi-
sion if their budget is equal to, or above, the
threshold set by the relevant EU directives.
New projects and extensions
The extensions of the Athens’ Metro and the
Trade with Greece
103
1...,95,96,97,98,99,100,101,102,103,104 106,107,108,109,110,111,112,113,114,115,...188
Powered by FlippingBook